Harbour Masters Instructions

HMI 23 35 Port of Devonport Berth 3 E Berth pocket Sea levelling works Issued 24 November 2023 Valid until 30 November 2023

261.6 KB

HMI 23 34 Port of Devonport Pile Installation Edge Shipping Basin New pile near swing basin beacon N13 S Issued 27 November 2023 Valid until 28 February 2024

293.0 KB

HMI 23 32 Port of Devonport Berth 3 East Scour Protection Issued 20 November 2023 Valid until 23 December 2023

336.3 KB

HMI 23 30 Devonport Berth 2 East Dive Works Issued 16 November 2023 Valid till 27 November 2023

201.9 KB

HMI 23 17 Devonport Berth 3 East Piling Operations Issued 15 May 23 Valid until 31 January 2024

289.8 KB

HMI 23 01 Port of Devonport Berth 3 East Construction Works Issued 10 January 2023 valid until 31 January 2024

206.2 KB

HMI 23 16 Devonport 5 West Gas Chem Vessel mooring Issued 05 May 2023 valid until Cancelled

354.6 KB

HMI 22 73 Harbour Masters Instruction Devonport Virtual Aid to Navigation Issued 21 10 2022 valid until Cancelled

413.9 KB

HMI 22 75 Harbour Masters Instruction Post Flood Intrim Minimum Depths Devonport Issued 21 10 2022 valid until Cancelled

472.9 KB

HMI 23 03 Harbour Masters Instruction Minimum Declared Depths Port of Devonport Issued 17 01 2023 valid until Cancelled

209.1 KB

HMI 22 65 Pilot Transfer Arrangements Issued 21 10 2022 valid until Cancelled

1.1 MB

HMI 22 51 Devonport waterfront hotel development Visibility range of Mersey River entrance lead lights Issued 26 August 2022 valid until cancelled

289.0 KB

HMI 22 49 Port of Devonport Floating Current Profiler established Issued 19 August 2022 valid until cancelled

213.7 KB

HMI 22 40 Port of Devonport Traffic Timing Separation Issued 25 July 2022 valid until cancelled

302.5 KB

HMI 21 33 Amendment to Towage Requirements for 130 180m LOA Less than 8m draft

324.5 KB

HMI 21-26 Compulsory Check Pilotage Audit for vessels 75m LOA and over

406.0 KB